A rough timeline of how it works.
Five stages, from the first electricity bill we look at to a fully commissioned plant with IoT monitoring live. Most projects move from audit to handover in three to six months.
Audit → Design → Procurement → Construction → Commissioning.
Audit
Top-line assessment of what's possible.
- Top-line energy & cost assessment
- 12 months of electricity bills
- Existing equipment list & nameplate data
Design
Walk the site, draft the system.
- Letter of Award (LOA)
- On-site engineering audit
- Proposed system layout & single-line diagrams
Procurement
Assemble the right kit, not a catalogue bundle.
- Selective component sourcing
- Chillers, AHUs, pumps, blowers built to spec
- Factory acceptance & QA
Construction
Install, integrate, test.
- On-site installation of the system
- Mechanical, electrical & controls integration
- Functional testing on every loop
Commissioning
Hand over a fully operational plant.
- System fully operational
- IoT monitoring live & baselined
- Performance verification against KPI
Audit
Top-line assessment of what's possible.
- Top-line energy & cost assessment
- 12 months of electricity bills
- Existing equipment list & nameplate data
Design
Walk the site, draft the system.
- Letter of Award (LOA)
- On-site engineering audit
- Proposed system layout & single-line diagrams
Procurement
Assemble the right kit, not a catalogue bundle.
- Selective component sourcing
- Chillers, AHUs, pumps, blowers built to spec
- Factory acceptance & QA
Construction
Install, integrate, test.
- On-site installation of the system
- Mechanical, electrical & controls integration
- Functional testing on every loop
Commissioning
Hand over a fully operational plant.
- System fully operational
- IoT monitoring live & baselined
- Performance verification against KPI
Three things and we can give you a top-line answer.
No NDA dance, no long forms. Just enough to size the prize and tell you whether it's worth a deeper look.
12 months of electricity bills
TNB or equivalent — PDFs or scans are fine. We need a full year so seasonal load shows up.
Equipment list
Chillers, AHUs, pumps, lighting, solar — make/model and approximate age if you have it.
A short brief
What's hurting? Bills, comfort, downtime, sustainability targets — all useful context.
Send the bills. We'll send back a number.
A free top-line assessment, usually within a week. If it makes sense, we go deeper. If it doesn't, we'll tell you that too.